Projects & Case Studies
Real structures, real water, real results — documented before and after.
Municipal
Sanitary Manhole Leak Repairs — City of Waterloo
Active groundwater inflows through joints and pipe penetrations in three sanitary manholes sealed by polyurethane injection — without taking the sewer out of service.
Read the case study
Municipal
Manhole Leak Repairs — Tavistock Community Centre
Infiltration through pipe penetrations in a precast manhole stopped with water-activated resin, keeping fines out of the sewer and the structure in service.
Read the case study
Municipal
Sanitary Manhole Ladder & Landing Repairs — Township of Wellington North
Deteriorated access ladders and landings in two deep sanitary manholes replaced by confined space entry, with the drop pipe secured — manholes safe to enter again.
Read the case study
Rail & Transit
Project #70-15-13-2842
Box Beam Bridge Girder Grouting — Kipling Avenue, Etobicoke
Fourteen box-beam girder joints filled with 14,600 litres of 55 MPa non-shrink grout in two days over a live road on the Metrolinx Georgetown corridor.
Read the case study
Rail & Transit
Project #70-15-11-2434
Rail Crossing Casing Annular Grouting — Douro Street, Toronto
A 50 m, 1,200 mm casing carrying thirty FRE ducts under the rail corridor filled with 46 m³ of lightweight grout at 20 psi — every duct proven clear on completion.
Read the case study
Highways & Tunnels
Grout Pipe & Bulkhead Installations — Highway 407 Culvert Relining
Staged, low-pressure annular grouting of sliplined culverts under Highway 407 — grout pipes and bulkheads installed by our crew for a complete, liner-safe fill.
Read the case study
Highways & Tunnels
SEM Tunnel Injectable Tubing Injections — Highway 407 & Jane Street
Cold joints in a sequential excavation method tunnel sealed through pre-installed injectable tubing, with every joint documented port by port.
Read the case study
Rail & Transit
Transit Tunnel Joint Sealing & Backwall Grouting — Calgary
Leaking joints in a light rail tunnel sealed and voids behind the liner filled at track level during overnight possessions, without disrupting service.
Read the case study
Want This Kind of Report on Your Structure?
Every project gets documented — before, during, after, and what we’d recommend next.