Grout Pipe & Bulkhead Installations — Highway 407 Culvert Relining
Staged, low-pressure annular grouting of sliplined culverts under Highway 407 — grout pipes and bulkheads installed by our crew for a complete, liner-safe fill.
Staged, low-pressure annular grouting of sliplined culverts under Highway 407 — grout pipes and bulkheads installed by our crew for a complete, liner-safe fill.
Cold joints in a sequential excavation method tunnel sealed through pre-installed injectable tubing, with every joint documented port by port.